| Project Name | Jiangsu Greenland ideal city exhibition hall | Project Introduction | P2. 5 module front screen resolution 3840 × 1152 ground screen resolution 3840 × one thousand three hundred and forty-four |
|---|---|---|---|
| Project Date | 2020.09 | Equipment used | F2×1、ES16×2、G612×120 |
| Project Location | Jiangsu | Project Requirements | 1. Two screens display a complete picture, which can be played smoothly without jamming and dislocation; 2. One computer control; 3 point to point display. |
View all cases
-
Autumn harvest uprising immersive experience center
Project Name::Autumn harvest uprising immersive experience center
Project Date::2020.01
Project Location::Tonggu
Project Introduction::P2.5
-
Beijing maker town
Project Name::Beijing maker town
Project Date::2022.04
Project Location::Beijing
Project Introduction::1. A large main screen on the front
-
Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Name::Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Date::2022.07
Project Location::Ninghe District, Tianjin
Project Introduction::1. Two U-shaped strip screens on the front 2. One interactive ground screen.
-
Zhejiang Taizhou Laoshui plant
Project Name::Zhejiang Taizhou Laoshui plant
Project Date::2021.07
Project Location::Taizhou City, Zhejiang Province
Project Introduction::The space-time corridor, wall surface, top surface and column form a whole
-
An exhibition hall in dongguan
Project Name::An exhibition hall in dongguan
Project Date::2020.01
Project Location::Dongguan
Project Introduction::Indoor P2.5 project, trapezoidal screen
-
Haier group international exhibition hall
Project Name::Haier group international exhibition hall
Project Date::2018.09
Project Location::Shandong
Project Introduction::Two servers have unified control over 20 screens to achieve complete point-to-point display. One plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Name::Arc slide opening and closing screen of Jiangxi Ji'an International Convention and Exhibition Center
Project Date::2022.07
Project Location::Jiangxi Province
Project Introduction::1. P2.5 module, whole screen 6016 * 1664 2. Five part screen, separable and separable, slide rail opening and closing screen
-
Hebei publishing media group
Project Name::Hebei publishing media group
Project Date::2022.04
Project Location::Shijiazhuang, Hebei
Project Introduction::1. Point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right LCD 6*3. Two sets of F2 are used for cascade control to realize the unified management of all screens.
-
An exhibition hall in Hangzhou
Project Name::An exhibition hall in Hangzhou
Project Date::2020.07
Project Location::Hangzhou, Zhejiang Province
Project Introduction::P1.53 Small spacing immersive experience hall